Precautions for tower crane jacking operation
发布时间:
2019-09-29 20:14
Precautions for the lifting operation of the tower crane:
1) When the maximum wind speed of the tower crane is greater than level 3~4, the lifting operation is not allowed.
2) During the jacking proc
Address: No. 10, Fuxing Road, Dingjiang Town, Lingchuan County, High-speed Railway Economic Industrial Park, Guilin City, Guangxi
Url:http://en.changloong.com/
Chinese url:桂林长龙 . 网址
Email:1065119695@qq.com
WeChat public account
Copyright © 2022 Guilin Changlong Machinery Co., Ltd. Power:300.cn 桂ICP备19001220号-1