Precautions for tower crane jacking operation


发布时间:

2019-09-29 20:14

Precautions for the lifting operation of the tower crane:

1) When the maximum wind speed of the tower crane is greater than level 3~4, the lifting operation is not allowed.

2) During the jacking proc

图片名称

Guilin changlong Military-grade quality


Address: No. 10, Fuxing Road, Dingjiang Town, Lingchuan County, High-speed Railway Economic Industrial Park, Guilin City, Guangxi

Tel:0773-2699602
Url:http://en.changloong.com/
Chinese url:桂林长龙 . 网址
Email:1065119695@qq.com

图片名称

WeChat public account


Copyright © 2022  Guilin Changlong Machinery Co., Ltd.   Power:300.cn 桂ICP备19001220号-1